VC_MDG_ANA_CRTF_NODE - Configure Time Frames for Process Analytics

VC_MDG_ANA_CRTF_NODE - Configure Time Frames for Process Analytics

General Material Data   Fill RESBD Structure from EBP Component Structure  
This documentation is copyright by SAP AG.
SAP E-Book

This configuration activity enables you to configure interval fields (For example, Work Item Processing Days Intervals) used in work-item analytics for change requests.

1. Select the change request type.

2. Select the measure which you want to configure and provide an upper limit of each time frame.

Example

MAT01 (Create Material)

o,,Work Item Processing Days 0.5

o,,Work Item Processing Days 1.0

o,,Work Item Processing Days 3.5

o,,Work Item Processing Days 5.0

In the Work Item Analytics apps (For example: Monitor Open Work Items from Change Requests and Analyze Completed Work Items from Change Requests) for the field Work Item Processing Days Intervals, 5 possible intervals are provided: < 0.5, 0.5 – 1.0, 1.1 - 3.5, 3.6 – 5, > 5.0.

You can also define the Factory Calendar on change request type level, so that in the analytics apps, the time fields Average Work Item Processing Workdays and Total Work Item Processing Workdays are generated based on these settings.