Ansicht
Dokumentation

WB2_MATERIAL_IN_SHD - BadI: Material Check for Assignment-relevant Items

WB2_MATERIAL_IN_SHD - BadI: Material Check for Assignment-relevant Items

rdisp/max_wprun_time - Maximum work process run time   ROGBILLS - Synchronize billing plans  
This documentation is copyright by SAP AG.
SAP E-Book

This Business Add-In (BAdI) is used in SAP Global Trade Management(SAP GTM) in the Global Trade (LO-GT) component.

You can use it in the area of assignment management to control which materials are allowed when an item either has follow-on items or when it is derived from another item.

Note

If you do not implement this BAdI the material cannot be changed if the current item has follow-on items or is derived from another item.

For more information about the standard settings (filters, single or multiple uses), see the Enh. Spot Definitions tab in the BAdI Builder (transaction SE18).

For information about the implementation of BAdIs in the context of the Enhancement Concept, see SAP Library for SAP NetWeaver under BAdIs - Embedding in the Enhancement Framework.

A trading contract for load is created with reference to a trading contract for load planning. To replace the material in one of the involved items (either in the trading contract for load or in the trading contract for load planning), you have to implement method IS_NEW_MATERIAL_COMPATIBLE. The method must be implemented because the item of the trading contract for load planning has follow-on items and the item of the trading contract for load has a predecessor.






ROGBILLS - Synchronize billing plans   General Data in Customer Master  
This documentation is copyright by SAP AG.

Length: 2043 Date: 20240523 Time: 201741     sap01-206 ( 95 ms )