Ansicht
Dokumentation

_ISISFICA_INSO0019 - Configure Field Attributes for Insurance Object Categories

_ISISFICA_INSO0019 - Configure Field Attributes for Insurance Object Categories

ROGBILLS - Synchronize billing plans   SUBST_MERGE_LIST - merge external lists to one complete list with #if... logic for R3up  
This documentation is copyright by SAP AG.
SAP E-Book

In this activity, you define which fields

,,,,o require input (required entry)

,,,,o are ready for input (optional entry)

,,,,o are to be displayed (display)

,,,,o are hidden (hide)

during master data maintenance, dependent on the insurance object category.

Link Rules

  1. Linking the same criteria
The same criteria can be two or more roles, for example, that a business partner can have, or several roles that can be grouped together into a role grouping.
The field statuses for two identical criteria are linked, and then the result is linked with the third criterion and so on. Required entry has the highest priority here, followed by optional entry, display, hide, and the non-specified entry.
In this way, the field status is reduced to a single status.
Examples of linking:

Criterion 1         Hide        Op.Entry    Op.Entry

Criterion 2         Op.Entry    Display     Req.Entry


Interim Result      Op.Entry    Op.Entry    Req.Entry
  1. Linking all remaining different criteria (apart from the activity)
Different criteria can be, for example, role(s) and BP type (application object business partner) or relationship category and client (application object relationships).
The field statuses for two different criteria are linked, and then the result is linked with the third criterion and so on. Hide has the highest priority here, followed by display, required entry, optional entry, and the non-specified entry.

Examples of linking:

Criterion 1         Hide        Op.Entry    Op.Entry

Criterion 2         Op.Entry    Display     Req.Entry


Interim Result      Hide    Display    Req.Entry
  1. Linking the result with the activity
The result from above is linked with the field status for the activity. In principle, the same rules apply as above. In addition, the activity displaymeans that all the fields are no longer ready for input.

Examples of linking:

Interim Result       Req.Entry    Req.Entry   Op.Entry

Field Status Act. Op.Entry     Non-spec.   Display

Data Maint. Act. Create       Display     Change


Result               Req.Entry    Display     Display

Check the delivered attribute assignments, and change them where necessary.






Fill RESBD Structure from EBP Component Structure   General Material Data  
This documentation is copyright by SAP AG.

Length: 4297 Date: 20240523 Time: 182108     sap01-206 ( 46 ms )