Ansicht
Dokumentation

_ISPSFICA_B001FSTAT - Configure Field Attributes for Each Contract Object

_ISPSFICA_B001FSTAT - Configure Field Attributes for Each Contract Object

General Material Data   Vendor Master (General Section)  
This documentation is copyright by SAP AG.
SAP E-Book

In this step, you determine which fields

  • require an entry,,(Required entry)
  • are ready for input,,,,(Optional entry)
  • are displayed,,,,,,(Display)
  • are hidden,,,,(Hide)

during the maintenance of master records for each contract object type.

This links further criteria to the field status for each field, thus determining the status the field has in the master data entry screen.

Link Rules

  1. Linking the same criteria
The same criteria can be two or more roles, for example, that a business partner can have, or several roles that can be grouped together into a role grouping.
The field statuses for two identical criteria are linked, and then the result is linked with the third criterion and so on. Required entry has the highest priority here, followed by optional entry, display, hide, and the non-specified entry.
In this way, the field status is reduced to a single status.
Examples of linking:

Criterion 1         Hide        Op.Entry    Op.Entry

Criterion 2         Op.Entry    Display     Req.Entry


Interim Result      Op.Entry    Op.Entry    Req.Entry
  1. Linking all remaining different criteria (apart from the activity)
Different criteria can be, for example, role(s) and BP type (application object business partner) or relationship category and client (application object relationships).
The field statuses for two different criteria are linked, and then the result is linked with the third criterion and so on. Hide has the highest priority here, followed by display, required entry, optional entry, and the non-specified entry.

Examples of linking:

Criterion 1         Hide        Op.Entry    Op.Entry

Criterion 2         Op.Entry    Display     Req.Entry


Interim Result      Hide    Display    Req.Entry
  1. Linking the result with the activity
The result from above is linked with the field status for the activity. In principle, the same rules apply as above. In addition, the activity displaymeans that all the fields are no longer ready for input.

Examples of linking:

Interim Result       Req.Entry    Req.Entry   Op.Entry

Field Status Act. Op.Entry     Non-spec.   Display

Data Maint. Act. Create       Display     Change


Result               Req.Entry    Display     Display

Check and, if necessary, change the supplied attributes.






General Material Data   rdisp/max_wprun_time - Maximum work process run time  
This documentation is copyright by SAP AG.

Length: 4369 Date: 20240523 Time: 182201     sap01-206 ( 53 ms )