Ansicht
Dokumentation

_ISUCS_UCES_BBILLPL - Make Settings for 'Budget Billing Plan Adjustment' Service

_ISUCS_UCES_BBILLPL - Make Settings for 'Budget Billing Plan Adjustment' Service

BAL_S_LOG - Application Log: Log header data   General Data in Customer Master  
This documentation is copyright by SAP AG.
SAP E-Book

In this activity you make the necessary settings for the Budget Billing Plan Adjustment service.

Display Filter Area:
If the number of budget billing plans for the business partner > LIM_FILTER, then the filter area is displayed in JSP content_abbp_overview_html.jsp.

Variant ABBP:

value = 1 Variant 1: Budget billing plan overview
value = 2 Variant 2: Direct budget billing adjustment
value = 3 Variant 3: BB plan adjustment through extrapolation
value = 4 Variant 4: User can decide between variants 2 and 3

Minimum Distance ABBP:
The period between 2 subsequent Internet budget billing plan adjustments must be greater than MIN_DIST_LAST_ADJ (in days).

Maximum Adjustments:
A maximum of MAX_NUM_ADJ Internet budget billing adjustments are permitted in the current billing period.

Forced Filters:
(When the filter area is displayed:)

value = 0 The system displays all budget billing plans
value = 1 Before the system displays the budget billing plans, the user
must make a selection in the filter area

Customer Meter Reading or Cust.:
(Meter reading reason:)

value = 0 The TE410 customizing table is used to determine the meter
reading reason.
value = 1 MRREASON = 10 (corresponds to control meter reading)

Minimum Current Percentage:
Lower percentage limit for new budget billing amount, based on the current budget billing amount (variant 2)

Maximum Current Percentage:
Upper percentage limit for new budget billing amount, based on the current budget billing amount (variant 2)

Absolute Lower Limit:
Fixed lower limit (Variants 2+3)

Minimum Extrapolated Percentage:
Lower percentage limit for the new budget billing amount, based on the extrapolated budget billing amount (variant 3)

Maximum Extrapolated Percentage:
Upper percentage limit for the new budget billing amount, based on the extrapolated budget billing amount (variant 3)






rdisp/max_wprun_time - Maximum work process run time   Fill RESBD Structure from EBP Component Structure  
This documentation is copyright by SAP AG.

Length: 3091 Date: 20240523 Time: 154250     sap01-206 ( 32 ms )