Ansicht
Dokumentation
CPA578B - HDLC link establishment failed on line &23. (C G R) ( OS/400 )
ROGBILLS - Synchronize billing plans rdisp/max_wprun_time - Maximum work process run timeThis documentation is copyright by IBM.
Message : CPA578B
HDLC link establishment failed on line &23. (C G R)
Message Long Text :
Cause . . . . . : The X.25 network is not operational.
Recovery . . . : Verify that the X.25 network is operational.
Then do one of the following:
-- Type C to cancel recovery and to inform any applications that are waiting for an operation that the recovery has been canceled.
-- Type G to start the automatic communications recovery again as defined by the system communications recovery limit (CMNRCYLMT) for line &23.
-- Type R to try the operation one more time.
If the problem continues, press F14 to run problem analysis.
Possible choices for replying to message . . . . . . . . . . . . . . . :
C -- Cancel.
G -- Start automatic recovery again.
R -- Try again one more time.
Technical description . . . . . . . . : The error log identifier is &22. An high-level data link control (HDLC) disconnect mode (DM) response frame was received from the network during a connection attempt by the local system.
Message File : QCPFMSG
Library Message File : QSYS2924
rdisp/max_wprun_time - Maximum work process run time ABAP Short Reference
This documentation is copyright by IBM.
Length: 3253 Date: 20240426 Time: 161933 sap01-206 ( 3 ms )